Asbestos

Asbestos can be found in walls, pipe isolating layers, fire-protection walls, chimney, cable, pipes, titles, wire and valve cover layers etc.

Safe and Healthy Working Environment for the Workers
Control region is set up. Control region is separated from other working areas that reduce the number of people to contact with the asbestos. Authorized people to enter to control region should wear the mask. All people to enter to region should wear the mask. Eating, drinking and smoking in control region is prohibited.

Protective clothing and equipment for our workers
Type of protective clothing:
-  Overalls / boiler suits and etc
-  Gloves, safety helmet and safety shoes
-  Mask, safety goggle and other safety equipment assigning changing area
-  Change of dirty worker clothing ( with asbestos dust ) should only be done within such area. Unless authorized cleaning staffs / maintenances staffs / etc, nobody can be allowed to take away such dirty clothing out from the changing room.
-  All undressed dirty clothing should be put inside the assigned containers.
-  Labeling, markings of such containers for further disposal.

Removal of asbestos
Only properly trained personnel should be allowed to carry out work on ACM.
The Shipbreaking company to acquire and use personnel protection gear including coveralls, head covering, gloves, safety shoes, face mask and goggles. For cleaning, washing and decontamination, facilities to be provided.
- Install a fence around the asbestos removal areas with a warning sign ‘Asbestos removal in progress, do not enter without permission’. During the removal of ACM, no work to be carried out in adjacent area.
The dismantling process will begin from the accommodation area. Asbestos in this area is usually in the resilient flooring, roofing insulation and ceiling tiles. Dismantling areas will be posted with warning signs to restrict access and water sprayed at all times to minimise airborne asbestos dust. Once the dismantling process is complete, workers will promptly clean up the area by using water and filter vacuum cleaner. Asbestos from the engine room will mainly consist of packing materials and exhaust lagging. Packing materials to be removed by loosening flanges and disposing of gaskets in a sealed plastic bag.
Use the wet method of asbestos removal. Water sprayers are to be used to keep the ACM as saturated as possible during removal. Group two workers as a team; one is responsible for breaking down of all asbestos adhesive material such as metal wire or sheet, and the other is responsible for removing the asbestos. All ACM to be immediately put into double plastic bags and disposed of to a government designated area for further treatment. After the removal work, the area must be cleaned with water and vacuumed up.
Competent supervisors will inspect all asbestos work performed in the area during the dismantling process. They will immediately stop and correct any improper or unsafe practice.
- Once the daily procedure is finished, the asbestos worker must get washed up and put on clean clothing to prevent release of airborne asbestos. A decontamination unit, with a negative air pressure system to prevent spreading of asbestos dust outside, would be ideal.
The dismantled asbestos is to be collected and kept moist, packed in strong plastic bags, sealed, and a warning sign marked on the package. It is then transported to the asbestos warehouse and reported to the local environmental protection agency who will arrange deep burial at a designated area.

Disposal of Asbestos
The asbestos is collected from the vessel should be disposed transport to Wuxi city Special company(Wuxi Solid Waste Safety Disposition Company, has been issued with a certificate of compliance by the Environmental Bureau of Jiangsu Province, P.R.C )
The asbestos will be buried at the burying site.


Emergency Plan

Density of asbestos should be monitored anytime. Worker should be educated to concern health, safety and environmental protection. Alarm system should function well. Rescue teams are established including three safety teams in charge chaired by principal and minister. Medical services should be enhanced.

1.gif (634 字节) ASBESTOS
2.gif (634 字节) OIL
3.gif (633 字节) 有限空间
4.gif (634 字节) 切    割
5.gif (634 字节)

致冷剂

6.gif (634 字节) 个人防护用品
6.gif (634 字节) 预处理程序


Asbestos Worker Training


Remove Asbestos


Asbestos Decontamination Unit


Shower Room
Asbestos Storage

Burying Site

sailing.gif (2381 字节)  Back     Chinese Version   Recent Vessels Photos Dismantled     Meeting with PONL 

             CHANGJIANG  SHIPRECYCLING  YARD
              JIANGYIN CITY JIANGSU PROVINCE CHINA
                 PHONE:86-510-86168805     FAX:86-510-86031500

                 E-MAIL:port88@sina.com